More Stadium Stuff

A region of spacetime from which nothing can escape

My Rybak post the other day, though intended to be less about the stadium itself and more about what what we would be better off building instead of a stadium, prompted me to think a bit more than I wanted to about the Metrodome site for a new Vikings stadium.  Specifically a revelation about the plan to capture parking meter revenue prompted me to write a whole new post for this, but there are a couple other pieces I’d like to cover as well, and hopefully this post will prompt a catharsis that will put the whole topic out of my head.  Bear with me, please.

Meter madness

Minnescraper user newsole pointed out that it appears that only parking meter revenue from days with Vikings games would be dedicated to the stadium.  The plan doesn’t explicitly say that, but it does say that in the first year $842,500 would be raised from “1,000 Meters at $25 Plus 1,975 Meters at $30 each”, which newsole mathed out to “1000 meters x $25 + 1975 parking spots x 30 = $84,250 per game.  10 home games = $842,500 the first year.”  Convincing, but it does raise even more issues in my head.

Treasure Map

First, the cost of operating parking meters is not nothing.  Since this plan uses almost half the meters in the system, it presumably would represent almost half the daily cost of running the system.  (We’ll ignore the fact that these should be some of the more expensive meters to operate; since they are some of the highest-demand meters they are the ones that will offer the highest ROI for enforcement, so the city should also be spending more time enforcing them.  I don’t know if it actually does, though.)  However, the plan dedicates all of the revenue from these meters to the stadium, leaving other meters to cover their cost.  This is probably a relatively small cost, but it does remove revenue from other meters that would otherwise go to the general fund, so effectively more meters than the plan states will be going to stadium costs.  Presumably this is omitted from the plan out of laziness more than deceptiveness.  It’s not clear that the meter revenue is an attempt to present a veneer of user tax, and if it is, a bit more thought will show that to be untrue, as my next point may indicate.

Second, if 2,975 meters are dedicated to the stadium, some of them are going to be far enough from the stadium to be unintuitive for use as game parking.  Assuming 14 spaces per block face without curb cuts, the 227 block faces east of Marquette and north of 11th would account for 3,178 spaces, so presumably that’s the approximate area being considered for revenue capture.  But it’s hard to imagine someone cruising past all those ample lots in East Downtown still looking for a meter.  Because of the huge numbers of meters involved, this is going to be true regardless of where the line is drawn.  Many of these areas are nonetheless high-intensity destinations, and thus likely to suck in parkers despite the distance from the stadium.  But is it realistic to expect full occupancy all day?  Which brings me to….

Third, football games seem interminable to me, but my understanding is that in reality they only last 3 hours.  In some cases, people will arrive early and stay downtown all night before driving home.  These party animals may pay for a full day’s worth of parking, although my guess is that it would be rare for them to arrive at 8am, and those football fans that stay past dinner will be the exception.  I don’t know what the specific pricing plan is, but the current max rate of $2 per hour would net $30 per day if it were in use for the longest meter time, 8am to 11pm, currently only applied in the Warehouse District.  To get $30 per day for a more realistic estimate of a typical Vikings fan’s visit, say 6 hours, the rate would have to be $5 per hour, more than double the current highest rate and five times more than current rates around the dome.  Maybe people would pay – I don’t think that’s any higher than event parking in lots, and it would offer the advantage of not having to wait in line to exit the lot.  But it still seems unrealistic to expect the full daily amount at almost 3,000 spaces on every game day.  To get that, we’d probably need a Vikings team that’s a lot better than we’ve seen in a while.

Going with the wind

Will East Downtown get this...

Someone needs to tell Ted Mondale or R.T. Rybak the old proverb about the devil you know, since the vagueness of the East Downtown proposal seems giving birth to monsters in the minds of key stakeholders.*  This problem is compounded by the fact that the Metrodome sit has gone through several cuts of revisions, to the point where it makes up at least 6 mostly contradictory entries on Bill’s Top 19 Renderings list, the most recent of which I think is #19 on this list, summarized by the author as “I have no idea what is going on with this. Are those trees?”

This key stakeholder confusion bubbled over into an even more obfuscatory Star Tribune article about how some local counties’ morgues might merge and how mad Rich Stanek is about it, or something.  Anyway, the story reports the Emperor Mondale offered the county morgue as tribute to the Vikings in the form of a plaza.  If the team magnanimously accepts this offering and Hennepin County’s petty objections can be pushed aside, it would create a plaza of around 6.5 acres.  Apparently added to that would be the balance of the Metrodome’s footprint after the new stadium was built to the east but overlapping it to some unknown degree.

...or this?

For comparison’s sake, Elliot Park is 6.44 acres.  Plazas of that size are usually described as barren and windswept.  The U’s West Bank has been described as such despite having much smaller contiguous open spaces.  Philadelphia’s Rittenhouse Square, however, is about the same size and has been often praised, but has the benefit of being more park-like, with rows of trees and shrubs breaking up the space.   We don’t have many clues as to what kind of plaza we’ll get, but the existing nothingness of East Downtown’s** streetscape prejudices me into the assumption that it will be more Tienanmen than Millennium.

11th hour for 11th Ave

Reuben discussed the fate of 11th Ave S on streets.mn recently.  The pliability of this street is apparently responsible for the feasibility of the Metrodome plan, as by sacrificing itself it allows the Vikings to avoid playing at the U of M while the new stadium is under construction.  But, as with the possible proposed plaza, details are scarce on just how 11th will be plied.

11th Ave Complete Street Tunnel

Reuben’s discussion pretty much nailed my concerns about the physical result of tussling with 11th – closing it would further isolate the already freeway-carved neighborhoods, there is a danger of severing or rendering less useful the crucial bike route, and decking the new stadium over 11th would probably accomplish those things and create quasi-freeway conditions that would endanger the usability of the street beyond the covered segment.  My concern is more about the process – while 11th Ave doesn’t have metrowide significance, it’s pretty damn important to the neighborhoods it runs through.  If the worst boogiemen are realized about the stadium plan, and 11th ends up tunnelized or severed, this will have been a significant change to local infrastructure that was initiated with almost no public input.  I believe that EISes are usually waived for sports palaces like these, and I’ve heard no sign that the public will even be able to see the plan before it’s finalized, much less comment on it.  Probably the most galling thing about it is that this type of top-down democracy is coming from touchy-feely democrats like Mark Dayton and R.T. Rybak.  (The latter has been quoted as refusing to hold a referendum on the plan, saying “The referendum is when I stand for re-election.”  The Mayor has that right, at least.)    Mark Dayton, of whom I’m a huge fan, keeps rattling on about a “People’s Stadium” but has forgotten to invite the actual people.  It’s amazing the hypocrisy that is exposed when a popular millionaire asks for a handout.

Are you done yet?

Whew.  I hope that’s all I have to say about this stadium for a while.  Hopefully you found something more interesting to read before you got to this part.  If not, I promise not to do this to you again until at least 2016, when we all will start getting Stadium Investment Capture taxes deducted from our paychecks.

*I faintly remember a blissful time in my life before I was aware of the word stakeholder.

http://www.minnpost.com/two-cities/2012/01/council-members-balk-current-minneapolis-stadium-plan-most-are-staying-flexible

Bottineau-no for North, part III

Here is the last of my three-part Bottineau rant, which at this point may be considered a full-fledged tirade.  Somewhat coincidentally, it arrives on the same day the Minneapolis City Council makes its recommendation for a Locally Preferred Alternative, which is more or less required by the FTA for the project to advance.  It looks like the Council has acquiesced to the LRT D1 alternative – Wirth-Olson – but with the clever stipulation that Hennepin County and Metro Transit agree to develop at least one arterial transitway through North Minneapolis along Penn, Emerson/Fremont, or West Broadway.  I’m not aware of any attempt by the city to gather their citizens’ opinions, outside of  the county-led process, but of course you can always provide input to the Bottineau project office.

My last post proposed the consideration of an LRT subway through North Minneapolis, which would do a zillion times better job of serving the heart of the Northside without the impact of a surface route, and based on our history with Hiawatha is unlikely to be as expensive as other recent American below-grade transit projects.  An LRT subway will not be considered in Minnesota – it’s just too “coastal.”  In that case, I think the best alternative for Bottineau would be BRT on West Broadway.  This was actually considered in the AA study, and scored well enough that it just barely missed the arbitrary cutoff to make it to the scoping phase.  Actually it would have probably made the cutoff (unless the cutoff was again raised to exclude it) if the AA study hadn’t penalized all BRT alternatives.  See for yourself- here is the Traveler Time Savings (in regional minutes per day) measure from page 76 of AA study:

Not enough minutes in the day

The study claims that “LRT alternatives outscore BRT alternatives on this measure because they have shorter end-to-end travel times” which is interesting because a) the BRT and LRT alternatives would follow identical alignments, and b) technically buses and trains are capable of the same operating speeds.  Because the chart above is pretty much the most detailed information in the AA study about travel times, I’m not sure how they determined that BRT alternatives would take longer than LRT in the exact same alignment.  The study also projected fewer riders for BRT alternatives, but not nearly enough fewer to explain the missing minutes.  Here is a comparison table I made using data from the AA study:

This chart teases us with a clue:  It may have had something to do with the Interchange, Hennepin County’s platitudinously named train station, which is the only point where some LRT and BRT alternatives diverged.  Specifically, D3 and D4, the former of which does significantly worse on traveler time savings, are assumed to run “on a busway parallel to the I-94 viaduct” then to turn south a block to stop at the Interchange, then proceed eventually a block back north to 4th St.  This is a terrible idea.  If they were actually thinking about how to maximize the benefits of the transportation system, D3 and D4 would have an advantage over the other alternatives because they could use the viaduct itself.

The 4th St Viaduct (should be plural, since there are actually two viaducts) is massively overbuilt.  It is two lanes in each direction, but caters primarily to peak traffic, leaving at least half the roadway underutilized at all times.  If one viaduct were made reversible, the other could be used for a two-way busway, providing a transit advantage into Downtown Minneapolis.  In addition, if the south viaduct were used, it could provide an even better, if more expensive, connection to the Northstar station than LRT would:

Which would you prefer?

The viaduct could connect directly to West Broadway with a little modification of the existing interchanges.  Basically a ramp could just be added from West Broadway to the existing ramp from I-94 to the viaduct, and then another ramp from that ramp over to the other viaduct.  It’s a bit trickier to connect the westbound viaduct to westbound West Broadway.  The Alexandrian way, depicted below, would just build a flyover from the viaduct to the 94 ramp to Washington, at which BRT could have signal priority.  Ideally the BRT viaduct would connect to I-94 so express buses could use it too, which could be done by adding a ramp going straight where the westbound ramp bends to meet Washington.  In addition to a station at the Interchange, there could be one serving the densifying North Loop at 8th or 10th Ave N.

Green is BRT, Yellow is I-94 access, Red is the relocated ramp from I-94 to Lyndale Ave

Another reason the West Broadway BRT (D4 on the chart) scored well in general is that it wasn’t really BRT, at least not east of Penn, where the alternative studied would operate in mixed traffic.  This was done to “eliminat[e] the need to disrupt traffic or remove businesses.”  Of course, disrupting traffic is to some degree the goal of developing transitways; you want to shift traffic from cars to transit vehicles.  But is disrupting traffic or removing businesses necessary to accommodate BRT on West Broadway?

As I mentioned above, West Broadway is 80′ east of Penn, and they cram in four through lanes and parking in many places.  Traffic counts hover around 20,000/day, but drops off steeply west of Emerson/Fremont, so that the counts west of Morgan are around 10k/day.  Assuming west of Girard only two traffic lanes are needed, guideway will fit there without widening even on the 75′ sections – assuming a 28′ guideway and two 11′ through lanes, 25′ are left over for sidewalks or maybe parking in some places.  East of Girard, 28′ will be needed for guideway and at least 40′ for four through lanes (suck it up, Hennepin County and MnDot, 10′ lanes works for much busier streets, even with trucks).  That means the road will need to be widened slightly (mostly 90′, but possibly 100′ at stations.)

Widening this area of West Broadway would not be like widening Penn.  Frankly, there aren’t many buildings left to destroy here.  If the widening was taken from the north side of the street east of Fremont (there should be just enough room on the block west of Fremont for 90′ with tearing down buildings – the bright side of setbacks), then switch to the south side east of Bryant, there should be room for 90-100′ without tearing down anything except the small cluster west of Emerson.

Joe Gladke, Hennepin County’s Manager of Engineering and Transit Planning, mentioned in a presentation to the Minneapolis TPW Committee that LRT and full BRT was dropped from West Broadway because of business owners’ concern over loss of parking.  That’s like being concerned over loss of sand in the Sahara.  I did a quick measurement of parking lots in the West Broadway business district and found that 16 of the 64 acres between Girard and 94, 18th and 21st are parking lots – that’s 25% of the gross area!  (And that’s not counting the 550 space lot that will be built with MPS’ new headquarters.)

Lots of lots (sorry I couldn’t resist)

So it’s possible to build reserved-guideway BRT on West Broadway that won’t disrupt traffic and will remove only a handful of businesses.  This alignment would go through the heart of North Minneapolis, serving thousands more residents, and present ample opportunities for TOD (see vast parking lot fields above).  Based on the cost estimates from the AA – where BRT generally came in at around half the cost of LRT – it would still cost substantially less than the proposed LRT alternatives.  That would allow perks like the conversion of the 4th St Viaduct to a combined reversible roadway and two-way busway, which would serve an additional high-density neighborhood and provide a benefit to the express bus network.

The lower cost of BRT would also allow both Brooklyn Park and Maple Grove to serve as termini for the same price, although the AA study didn’t find benefits commensurate to the costs of serving both branches.  I stubbornly maintain that if we’re going to spend regional money on a development-inducing transitway, it would benefit the region more to serve existing struggling activity centers like Brooklyn Center rather than provide a further incentive to fringe development.  But the other advantage of BRT, apparently unexplored in the Bottineau process, is that multiple routes with vastly different termini can branch out after using the busway, known as Open BRT.  So Maple Grove and Brooklyn Park could both be served, even if the guideway continues to Brooklyn Center, as could Plymouth, New Hope, Crystal or even Rogers.

I hope I’m not focusing on BRT because of the recent flak Hiawatha has taken from anti-transit ideologues, who nonetheless have a valid point about how expensive the line is both to build and to operate.  Central and likely Southwest serve enough high-density areas that they’re likely to better justify their costs, and since Hiawatha serves major regional destinations like the airport and the MOA it will likely benefit significantly from the network effect of three light rail lines.

Bottineau, on the other hand, doesn’t serve a major regional destination outside of Downtown Minneapolis, so it is unlikely to benefit from a network effect outside of the meager one accounted for in the AA study.  The Wirth-Olson alignment serves only one relatively high-density and high-poverty neighborhood – around Van White – and has few potential candidates for redevelopment inside the beltway.  It runs through almost three miles of parkland for chrissakes!  It just doesn’t make sense to spend a billion dollars on a transitway with that little potential.  It’s unlikely my proposal for full BRT on West Broadway will be considered in the DEIS, much less an LRT subway in North Minneapolis, but I hope that BRT stays in the running.  I want to believe in LRT for Bottineau, but it looks like BRT is a better option.

People are already walking to the future Golden Valley Road station

Bottineau-no for North, part II

In my last post, I went through some of the reasons why existing land use is unlikely to support even the medium-capacity transit system provided by LRT or BRT Bottineau alignments.  In the absence of inflated commuter ridership figures, the only compelling reason to build the line is economic development.  But if Bottineau is being built primarily for economic development, why is it avoiding the most economically disadvantaged part of the state?  If Bottineau is supposed to encourage the development of housing and jobs along the line, why not route it to areas in need of redevelopment rather than to the fringe?  Why should we spend a billion dollars to just encourage more development on the edge of town?

If a goal of the line is economic development, there is a better northern terminus:  Brooklyn Center.  According to DEED data compiled by the Met Council, Brooklyn Center lost more than 5,000 jobs between 2000 and 2010, which is no more than a crumb of the Metro area’s total jobs (around 1.5m), but represents almost a third of the jobs once held in this community within easy commuting distance of some of the state’s poorest neighborhoods.  Developing a major job center on the old Brookdale site would have been ideal from a regional planning standpoint:  more so than the sprawling Arbor Lakes area (this is where a pedestrian was recently hit and killed by a car while on the sidewalk), and especially the fringe site of Target Suburban Headquarters, Brooklyn Center is adequately served by existing transportation infrastructure, including an easy (if theoretical) bus ride from the Fridley Northstar station.

Target Suburban HQ on Brookdale's footprint

Right-of-way is readily available in the median of Hwy 100 – at about 25′, it’s not quite wide enough for LRT guideway, so it would likely require some reconstruction of the roadway, probably shrinking the outside shoulders a bit – and alongside Shingle Creek Pkwy further north.  The most expensive elements would be flyovers from the BNSF track north of Robbinsdale onto Hwy 100 and from the freeway onto Shingle Creek, and widening or replacing the bridge over Twin Lakes.  I depicted a station at France, but since that would require a good 45′ of median, the full roadway would need to be reconstructed and the overpass replaced, so the low-density area probably wouldn’t immediately be worth the expense.  Anyway by the time this is built, Surly will probably have moved to their “destination” brewery, so no big loss.

This route may seem indirect, but I think it makes more sense in terms of regional connectivity and suburb-to-suburb travel.  Assuming a network of freeway BRT-ish routes, a more complete grid would be formed by extending a Hwy 100 route along Bottineau Blvd north of Robbinsdale rather than jutting east to Brookdale.

Would a Brookdale route be time-competitive with cars?  Google says that the fastest route from Brooklyn Center Transit Center to 4th & Hennepin is 13 minutes without congestion.  Based on the average speeds of Hiawatha, a light rail version of my proposed route running in a tunnel from the BNSF line to Plymouth and I-94 would take 17 minutes from Bass Lake Road (near Brooklyn Center Transit Center) to the Warehouse District station, about 30% longer than google  (and much less time than the existing express buses, which go through Camden and take about a half hour).  That compares well to Central LRT, which takes about 29% longer than the 94 route (if you believe the dubious claims) and a whopping 89% of google’s drive time.

Approx. route for Bottineau on bedrock map of North Mpls - red is segment in tunnel

Of course, tunneling is expensive, and as I mentioned above, it’s hard to believe the Penn or Wirth-Olson alternatives will deliver the ridership to justify even surface-running light rail.  But we’re not talking about New York or Seattle here – North Minneapolis lies on an excellent surface for deep-bore tunneling, easy-digging sandstone capped with a solid, stable roof of limestone.  Best of all for a Northside route, the portals would both lie in a sandstone layer.  Based on Hiawatha’s tunneling costs, the 5 km required for a Northside LRT subway would cost $300m, about a third of the projected costs for the other LRT alternatives.  Best of all, it would reach the heart of North Minneapolis without destroying existing communities or severing the street grid.  I think it’s worth considering, but the project managers do not.  Here is an email I sent them two years ago and their response:

12/04/2009 01:10 PM

To: bottineau@co.hennepin.mn.us

cc: gail.dorfman@co.hennepin.mn.us

Subject: complete Alternatives Analysis for Bottineau

Hi,

In order to completely evaluate the alternatives for the Bottineau corridor, another alternative should be considered that would be light-rail or bus in a tunnel through North Minneapolis.

Minneapolis and Hennepin County are finally ready for world-class transit and, considering the major overhaul in Federal transportation funding due next year, the Federal government may finally be ready to give Americans the quality in public transit that they deserve (and that has been exclusively bestowed on the motoring public up to now).

North Minneapolis has some of the highest rates of transit ridership in the Twin Cities, and, after a history of public disinvestment in the area, they deserve a high-quality transit line. I am confident that, if projections take into consideration a built-out transit system, the ridership would justify the higher cost. It would also benefit the suburban commuters as a grade-separated direct route would likely offer the quickest travel time into and out of downtown Minneapolis.

I have more ideas about an North Minneapolis subway alternative for the Bottineau Corridor, and, if you’re interested, I’d be happy to expound on them. If not, I thank you for your time.

Sincerely,

Alex

From: “bottineau@co.hennepin.mn.us” <bottineau@co.hennepin.mn.us>

To: Alex Bauman

Sent: Friday, December 11, 2009 4:25 PM

Subject: Re: complete Alternatives Analysis for Bottineau

Mr. Bauman,

Thank you for your email regarding the Bottineau Transitway Alternatives Analysis Study and your thoughts regarding a tunnel alignment concept through North Minneapolis.

We share your interests in providing high quality transit services for Twin Cities residents including those who live in North Minneapolis.

As you likely know, our study process is being conducted in collaboration with FTA guidelines as they exist today. Hennepin County is also actively engaged in policy development and FTA proposed rule making regarding transitway investment programs in collaboration with our Minnesota legislative delegation in Washington DC.

Like you, we are also looking forward to potential changes in the Federal Transportation Re-authorization Bill and how this bill may lead to enhance the quality of transit provided in the United States, the Twin Cities Region, and Hennepin County. Should the transportation bill direct transformational changes in the way transit investments are made, Hennepin County and other units of government will be obligated to study the implications of these changes on the Bottineau Corridor.

However, we also think you deserve a sober historical perspective and look to the future regarding the potential to pursue a transitway tunnel design through North Minneapolis. As you’ve indicated, tunnels are costly (often in the range of 10 times the amount of a surface facility) and need substantial user benefits in order to justify their costs. It is instructive to consider that transitway tunnel construction in this country has been implemented through densely populated areas and/or high activity centers. Examples that come to mind include New York City, the Seattle Central Business District, and the San Francisco Central Business District. Relatively short segment tunnels have also been implemented for high activity centers such as San Diego State University Campus, the University of Washington Campus (entering construction at a expected cost of $1.95 Billion), and the Hiawatha LRT tunnel beneath our Minneapolis St. Paul International Airport. It should also be noted that tunnels tend to be implemented with high capacity transit modes such as subway metro lines. These systems provide higher capacity/utility than intermediate capacity BRT or LRT mode systems and can more easily justify tunneling costs.

The most recent local example of transit tunneling investigation/feasibility is for the Central Corridor LRT segment along Washington Avenue through the U of M campus. The cost estimate for a 2,050 foot tunnel was $128 Million above the cost of a surface running facility. This translates to a per mile cost of $329 Million. This estimate assumes no stations in the tunnel segment (stations add substantially to the cost of underground construction). It was determined that this tunnel segment was not feasible and the current Central Corridor LRT project includes a surface transit operations along Washington Avenue.

The approximate distance between 36th Avenue in Robbinsdale and the Minneapolis Transportation Interchange facility near Target Field is approximately 4.7 miles [He appears to be measuring here using the Wirth-Olson alignment, as though I'd suggest putting that already largely grade-separated alignment in a tunnel.  As the crow flies, the distance between 36th & the Interchange is 3.7 miles, and as I mentioned above, I think a tunnel could be limited to about 5 km. - Alex]. Using the $329 Million per mile cost from above to illustrate a rough order of magnitude, the cost of a transit tunnel through North Minneapolis could be in excess of $1.5 Billion without accounting for station facilities. This would more than double the current Bottineau Transitway alternative cost estimates.

North Minneapolis is a mix of single family with some higher density multi-family dwellings. This area does have relatively strong transit ridership now and potential into the future. Considering the growing needs around the country for transit investments one can appreciate how transformational the transportation re-authorization bill and funding program would need to be in order to justify long tunnel segments through lower density neighborhoods like North Minneapolis for intermediate capacity transit service like LRT.

In summary, your input is appreciated and we look forward to assessing how the federal transportation re-authorization bill will affect transitway concepts for the Bottineau Corridor.

Please let me know if you have additional questions or would like more information.

Regards,

Brent Rusco

An LRT subway station in a suburb of Stuttgart mostly characterized by single-family homes

He does a good, and probably justified, job of making me sound crazy.  He also builds his argument around tunneling projects that are entirely unlike those that would be reasonably considered for Bottineau.  I already mentioned that Minneapolis has a much more stable geology for tunneling than Seattle’s Ring of Fire location or New York’s famously hard and unstable schist.  Sandstone is called sand stone for a reason.  The Washington Ave example is more subtly inapplicable – a cut-and-cover tunnel was proposed for an extremely dense environment; even the cut-and-cover tunnel on Nicollet in Whittier studied for Southwest LRT was expected to cost less, and a deep-bored tunnel would certainly be less expensive per mile.  Finally, it’s ludicrous to suggest that LRT systems are rarely in tunnels; there are dozens of counter-examples, including Bergen’s system, which has around half the per km cost of Hiawatha despite running in tunnels for a quarter of its route.

It may seem inconsistent to say that land use doesn’t support the Wirth-Olson LRT proposal, but at the same time to champion an LRT subway.  The difference is a matter of objectives – the existing Bottineau process has the objective of “improving regional mobility” in the context of a transportation-engineering institution that has been slowly evolving over the past few decades until it at last includes factors such as effect on low-income communities.  But Bottineau as proposed runs through low-density areas, serves few job centers and generally avoids low-income communities, so it doesn’t really meet that objective.

A Bottineau process that considered a light-rail tunnel would probably be too expensive to meet traditional quasi-economic standards (though those traditional standards are giving a green light to a $700m roadway to carry 25,000 cars across the St Croix River), so it would need to come out of a more holistic institution, one that considered urban development  (and underdevelopment) and social justice (and injustice) along with transportation.   We do not live in a nation that considers urban development or social justice; instead we are a nation that is beholden to its land speculation industry and ignores centuries of racial discrimination while asserting a veneer of pluralism.   That is the nation we live in, but those of us who spend more time living in an ideal nation in the sky or in our heads will continue dreaming of an ideal transportation system, one that includes an LRT subway for North Minneapolis.

The next and final segment in this series will take us back to reality somewhat.  If reality is more your sort of thing, look for it here next week.

Bottineau-no for North, part I

I’ve always wondered how Central Corridor – running on existing right-of-way and enhancing what has long been an overburdened bus line serving thousands of low-income Minnesotans – can be compared to I-94 – which tore down entire blocks for a dozen miles to serve higher-income motorists.  Still the NAACP has been tenacious in their lawsuit against the project, which may be less of an indication of the staying power of racial issues than the depth of NIMBYism in American culture.

The Penn Alternative

That’s why it’s even more difficult to understand why the Bottineau Transitway project is still considering an alignment that would affect dozens of properties along Penn Ave.  I went to one of the recent open houses and heard the nervous queries of residents whose houses would be taken.  On top of the question of sensitivity towards racial issues in light of the history of racial iniquities perpetrated by the transportation engineering profession, the project mangers should remember that each resident is a prospective plaintiff.

All my streets, Lord, soon be widened

Not that it’s a terrible plan, if you forget that its subject area is a city in the USA with a typically long history of racial injustice.  Certainly the Northside was platted with too narrow streets – the quarter’s central artery, the inaptly name Broadway, is 80′ for only a mile east of Knox, but I believe it’s North’s widest street not counting the frontage road that is Washington Ave.  The Penn Alternative would widen the street to around 90-100′, assuming 20′ for two sidewalk/boulevards, 26′ for guideway, and 44′ for through and parking lanes.  The plan as pdfed includes some superfluous right turn lanes but otherwise is pretty close to what a quality design for an enhanced streetcar line would look like.

The biggest problem is that even the City of Minneapolis acknowledges, in its comments to the Scoping phase, that “it is not known whether [the parcels that would need partial takings for the Penn Alternative] could be redeveloped.”  Of course they could be redeveloped, especially in conjunction with the remainder of their blocks (i.e. the parcels facing Queen), but the question is whether there would be money and will.  The former is self-explanatory, the latter is a cultural issue – after a chunk of the parcels were taken for redevelopment, they wouldn’t meet the city’s “buildable” standard for single family lots.  I would say that only a dysfunctional culture would even want to build single family homes along a light-rail line, but we are still deep in the cult of Nimby, so that is what any community-based plan would likely call for.  Even if by some miracle apartments were proposed, developers would likely find the narrow parcels awkward for building.  Redeveloping the whole block would be expensive, politically difficult, and given the track record of large-scale public redevelopment in this country, potentially ghettoizing.

I guess it’s the Wirth-Olson alignment then

Double beg button on the wrong side of the pole from the walking path

Olson Highway is easily one of the worst roads in the state – an extremely wide ROW littered with beg buttons and broken sidewalks and a median that’s often less a refuge than a corral – so I hope that the city, county and state take this as an opportunity to improve it.  Unfortunately, preliminary concepts for the alignment along Olson put the track in the median.  This despite Olson’s 25k AADT, which easily fits on two lanes in each direction (and does fit on two lanes further west on Olson), especially with Olson’s ample room for turn lanes.

As much as LRT would improve Olson, I’m not sure I can support it on the Wirth-Olson alignment.  It’s a classic Dallas scenario – the line would strategically avoid all of the dense areas that would supply it with riders.  More than a year ago, Yonah Freemark pointed out that Dallas has the longest light rail system in the country, but still manages to skirt its densest neighborhoods.  Unfortunately we are seeing a similar path of least resistance followed in the Twin Cities of the North, where the Olson-Wirth alignment’s densest neighborhood would be Robbinsdale, where the 5.2 households per acre is closer to the standard for intermediate frequency bus service, and a bit more than half of what’s required to support light rail.  Densities are actually lower along Olson in North Minneapolis, where the local Hope VI renewal project replaced the rowhouses of Sumner Field with fewer units than were destroyed.

TLC's awesome employment density map, from their 2008 Transportation Performance Report

Commuter ridership is a dicey proposition as well.  While Downtown Minneapolis has slightly more jobs than Downtown Dallas, the prospects for reverse commuting are much lower on Bottineau than on any LRT line developed or proposed here so far.  Using the job cluster map produced by Reconnecting America, you can see that Hiawatha serves around 45,000 non-CBD jobs, most of which are clustered around the airport and MOA stations (that’s not counting Minneapolis South, which contains 26,000 jobs but stretches far west of Hiawatha).  Central LRT will serve a remarkable 125,000 non-(Minneapolis) CBD jobs, again mostly clustered along the line.  Southwest LRT will hit around 55,000 non-CBD jobs, although they’re less clustered so perhaps less likely to take the train.

Bottineau, in contrast, serves just two non-CBD job clusters:  Osseo, with a respectable 24,235 jobs, but over a sprawling area that stretches up to three miles from the nearest proposed station; and Maple Grove, with a barely noticeable 3,892 jobs but that still manages to be one of the lowest-density clusters on the map.  While both job clusters are likely growing, the growth would have to be spectacular and compact to begin to approach the job density of other transitways.  Target’s Suburban Headquarters, which is sometimes said to “anchor” the B alternative of the northern end of Bottineau, is projected to grow to a mammoth 5,200 jobs by 2014.

So Bottineau will add maybe 30,000 sprawling jobs to the 371,000 already connected by the three other transitways when it comes online.  It will pass through very low density areas.  It will cost almost a billion dollars.  Are we sure we want to do this?  What are some other alternatives?  I’ll explore them in my next couple posts.

Greenfields and trenches

A couple doozies in the agenda for the 9/27 Transportation & Public Works committee:

1. is the first waft of a new greenfield housing development in Bryn Mawr.  It seems that someone long ago went through a great deal of trouble to plat a few blocks south of Chestnut Ave and west of Upton, but then only built houses on maybe half the land.  Now someone else has decided that now (or relatively soon) is the time to finish building the blocks and to line them with single-family homes.  Here are the blocks in question:

This map produced by Mpls Public Works shows the parcels owned by the developer in grey

This map produced by Mpls Public Works shows the parcels owned by the developer in grey

I shouldn’t sensationalize:  this project has a long way to go before any ramblers or McMansions pop up.  The developer – Frank Stucky is the name in case you know him – asked the city to “open” the unbuilt portions of Vincent and Xerxes.  I’m unclear on whether that means the developer asked the city to build the streets and attendant infrastructure for him or whether he merely asked permission from the city to build them himself.  The tone of the report implies that the city is not interested in building these streets, but would allow the developer to do so.  Most intriguingly, it requires a report on the following:

identification of all applicable permits, processes, ordinances, and standards related to Public Works and Planning & Zoning for single family home development; the estimated cost of maintaining the improved roadways and related utilities; the estimated cost to construct the roadways and related utilities; documentation that confirms that the Owner/Developer is willing to bear the costs of such improvements; the proposed prospect for developing the currently vacant lots; estimated tax revenues to be derived from the developed lots vs. vacant lots; the ability of the roads to bear emergency vehicle access; the wishes of the neighboring landowners with respect to the opening of the roads and the development of the lots [who wants to bet on what the wishes of the neighbors will be? -alex]; identification of relative hardships, if any, caused by not opening the roads vs. relative hardships, if any, caused by opening the roads.

In other words, a micro-scale version of the recent report by Edmonton (thanks Brendon) on the “extent to which new residential neighbourhoods pay for themselves.”  (note- this quote is in Canadian)

I’ve done some rough measurements of the area and length of block face of the parcels in question, and based on the minimum lot area of 6000 sq ft and minimum lot width of 50′ in an R1 district, it looks like the developer could put up no more than 12 houses.  Interestingly, the lots appear to be platted at 5400 sq ft and about 40′ wide (presumably these blocks were platted decades before the zoning code was enacted), meaning they need to be either replatted or rezoned.  If that happens and they only require the more typical lot area of 5000 sq ft and width of 40′, 16 houses could fit.  If this were a more progressive part of a more progressive city (like, say, Chaska), some 22 houses could be placed on these blocks.

We can dream

All that speculation assumes the developer would like to build more houses on the lots, instead of just using them for a few houses on large lots.  It’s hard to tell exactly at this point, but it is likely in the city’s interest that more houses be built.  Because of the required approvals, the city actually has some leverage here – let’s hope they use it.  The committee postponed action for two cycles to wait until the report was ready – at least that sounds like what CM Colvin Roy was saying.

2. is my old nemesis, the proposed 4th St S ramp to Northbound 35W (now with its own project page).  The goal is to make it easier to commute back to your hobby farm in the northern suburbs from your boring job in Downtown Minneapolis by building a new ramp to 35W from CR-122 (aka the Washington Ave Trench), a mere 700 feet south of the existing ramp to 35W from Washington Ave S (the non-trench Washington).  Here is what the new time-saving on-ramp will look like:

Blaine is now two minutes closer

Apparently the news about a little construction project called the Central Corridor hasn’t made it out to Medina, because Hennepin County’s engineers forgot to put the new on-ramp configuration on this layout.  It shouldn’t make a big difference; the new ramp to Cedar is 300 feet from the stoplight proposed as part of this project.  But if we’re reconfiguring the Washington Trench to have a stoplight spacing similar to Lake St, maybe they could have thrown in a sidewalk or two?  Or at least made the new ramp to 35W a bit more perpendicular so as to not encourage as lethal speeding.

To understand why this ramp is superfluous, it helps to consider the history of this trench.  Sometime around the middle of the last century, someone decided that it took too darn long to drive from Downtown to the U of M.  There was just too much dense neighborhood in the way.  The Washington Ave Bridge was due for a replacement anyway, so they just tore down a bunch of the dense neighborhood and built a little mini-freeway to connect to the new bridge.

So while it may look like this project concerns the intersection of three roadways, Washington Avenue and its trenched doppelganger perform essentially the same function, that is to move traffic from west to east and vice versa.  With that understanding, the 8 existing ramps forming the interchange seem sufficient, and adding one seems superfluous.

Ramp map - ramps are numbered (including the proposed ramp in red), directions represent the destinations linked by the interchange

Why get worked up about a $13m project?  For one thing, it likely won’t be long before the whole thing needs to be redone again.  Right now, thanks to Central Corridor, the interchange is a pile of dirt except for a forked viaduct carrying vehicles from nb 35W to 3rd St S and Washington Ave (marked 6 and 4 respectively on the ramp map).  This viaduct will soon turn 50 years old, but is a sibling to a nearby bridge that will not be there to celebrate.  That means that chances are the viaduct will also need to be rebuilt soon, at which point it will be much more logical to make this interchange more diamond-like.  Rather than spend $15m for another flyover ramp, at that point it will make sense to instead build one ramp from nb 35W to the Trench, where a signalized intersection could accommodate all the movements that are currently made using the viaduct, including a connection north to Washington Ave, from which vehicles could access (or re-access, as the case may be) nb 35W.  Alternately, you could fit in a 400′ diameter roundabout, as I mentioned a few months back.

Circle gets the square

I admit that my radical side, considering the extreme disparity between transportation spending on cars and all other forms of transportation, is opposed to any new auto-oriented spending.  But I do have a timid, quiet, practical side that realizes that we live in an auto-dominated society (because of that modal disparity in spending) and realizes that there are some auto-oriented projects worthy of construction.  An example is the 35W access project, which proposes to increase the usefulness of a freeway to a neighborhood that it currently cuts through.  That is to say, it adds accessibility.  The 4th St ramp to 35W does not increase accessibility.  It does not increase safety.  It is a small reduction in trip time for some commuters.  The existing exit has working imperfectly for 50 years, so why choose this particularly cash-strapped moment to move forward with this project?

Of course the TPW committee voted in the consent agenda to spend $2m in city money on this nice gift for commuters from Anoka and northern Ramsey counties.

One more item, not from the TPW committee, but rather from the Planning Commission meeting of 9/13, but I haven’t seen anyone else discuss it so I’ll mention it briefly (or as briefly as I am capable of mentioning anything).

Gary Schiff has proposed amending the zoning code to blow the top off of the CUP ceiling for multi-family developments.  As it stands, you need a CUP for any building of more than five units.  Where that rule came from, I have no idea – while fourplexes and duplexes are more common, sixplexes aren’t unheard of and I knew a guy who used to refer to his building as a nineplex.  Anyway, if this passes, no hockey player will again need a CUP for his new sixplex.

The staff report contains some nice quotes:

  • The average fee for a conditional use permit is $750.00.  Between 2005 and 2010 there were 113 conditional use permit applications for multiple-family residential uses with five or more dwelling units submitted. At an average fee of $750.00 per application this amounts to $84,750 dollars that was collected.
  • Between 2006 and 2010, 92 percent of all conditional use permit applications for multiple-family residential uses with five or more dwelling units that were reviewed by the City Planning Commission were approved. Of the eight percent that were denied, other applications (i.e., rezoning) were typically required that were not supportable, so therefore the conditional use permits were also denied.
  • In both the City of St. Paul and the City of Bloomington, multiple-family dwellings are a permitted rather than conditional use in the zoning districts where they are allowed. In the City of Richfield, multiple-family dwellings over nine dwelling units in the MR-2 Multi-Family Residential District require a conditional use permit and multiple-family dwellings over 20 dwelling units in the MR-3 High Density Multi-Family Residential District require a conditional use permit.
  • The conditional use permit application for multiple-family residential uses with five or more dwelling units often adds relatively little value to the review process.

Good news as we move into an apartment “boom.”  Don’t get too excited, though – the proposal also would “require City Planning Commission action on site plan review applications for any development of ten or more units…” with an associated application fee.

County Road Rethink

Another Transportation & Public Works Committee meeting brings another layout to critique.

Hennepin County will be reconstructing about a mile of County Road 9 (called 45th Ave N between York and Xerxes, but Lake Dr west of York) in 2013 or 2014, and apparently 100 feet of it runs through Minneapolis, so the county was kind enough to ask for the city’s thoughts on the design.

Not much will be changing in Minneapolis – the roadway will be a foot narrower, which in this segment is accomplished by taking away a foot from the 15′ of paved shoulder (currently 6′ on one side and 9′ on the other).  Oh yeah, and those useless shoulders?  They’re going to make them both 7 feet, paint an arrow on them, and a bike symbol and poof!  It’ll be a bike lane.

The Layout

Bike lanes have actually been conjured along nearly the entire segment to be reconstructed, beginning at Xerxes and ending without any logical terminus at Josephine Lane or Lake Road.  This is a fulfillment of the Hennepin County Bike Plan, which shows a bike facility along Lake Dr connecting Victory Pkwy and a yet-to-be path along Bottineau Blvd, although the plan (a product of the late 90s) actually shows the Lake Dr facility as existing (as opposed to planned).  This raises questions in my mind about whether the little bike symbols shown on the layout will suffer the same fate as crosswalk markings on Minneapolis’ bike facility layouts, doomed to never be applied to pavement.

Speaking of pedestrians, I’m not sure the new design for Lake Dr looks as nice from above two shoes as it does from behind handlebars.  The plan makes minor improvement to the sidewalks – currently on the south side the sidewalk is mostly 4′ with a boulevard that appears to be 2-4′ narrow depending on the block, and on the north side the sidewalk is 8′ with no boulevard.  The plan will widen the sidewalk on the south side to 6′ but leaves the minor aesthetic detail of how to treat the north sidewalk unaddressed.

Meanwhile, I’d like to point out the very low vehicle traffic on this road – it peters from 9,300 on the west end near Bottineau to only 7,050 near Victory.  Frankly, this road is useful for only a small number of people, since it runs through a very low-density residential area with only a smattering of retail except for on its west end.  The intersecting streets are also very local, and on the north side of the road, with the exception of France Ave, don’t run for more than a block or two.

Why, then, does Hennepin County provide a continuous center turn lane?  Is the level of turning traffic really so heavy here that they need that extra 11′ of payment along the entire road?  And even if there is a lot of cars turning left, 7,000 vehicles a day don’t make for a very long queue.  Here’s a thought – why not just provide turn lanes where they’re needed?  Probably France and Indiana could justify a turn lane, and maybe one of the streets further east could be designated as a neighborhood access street and given a turn lane.  With that extra 11′ of right-of-way, Robbinsdale would have room for a nice wide boulevard on either side, plenty of room for nice tall trees to grow some day (if Robbinsdale doesn’t like trees, they could use the space for parking their cars, although they don’t exactly seem to be hurting for parking).

Gateway to R-dale's toniest subdivision, Chowen Downs

The half-block Minneapolis segment has a (probably) more justifiable turn lane, and the sidewalks do strange things there, in keeping with the strangeness of a park that is also a road.  I know that Minnesotan traffic engineers really hate striping crosswalks, but the five streams of non-motorized traffic at the intersection of 45th & Victory really does justify some paint, I swear.  Technically that intersection is out of Minneapolis’ jurisdiction, the Robbinsdale segment is thoroughly out of Minneapolis’ jurisdiction, and the whole damn thing is way out of my jurisdiction.  Still, I wonder if there is a polite way to say to Robbinsdale or Hennepin County “you might want to think about not fucking this up”?

Where do you park a train?

A TC&W train in St Louis Park, from a web page about hobos

Hennepin County has posted on its B- website the latest salvo in the Great Saint Louis Park Rail Wars.  They’ve created a page called Freight Rail whose sole reason for existence is to compile the cancerous accumulation of studies revolving around the relocation of the former TC&W track that is now known as the Midtown Greenway.

I’m pretty sure the page didn’t exist until the county released their Freight Rail Draft Staff Report on August 16.  That document contains an excellent summary of the controversy/debacle:

The origin of the current freight rail issue in St. Louis Park and Minneapolis was the severing of the freight rail line in the 29th Street/Midtown Corridor in the 1990’s. This action was part of the TH55/Hiawatha Avenue project funded by MnDOT and the Federal Highway Administration (FHWA).  MnDOT and FHWA made the decision to sever the freight rail line rather than to construct a grade separated crossing. This decision was made due to geometrics, topography, and costs. After the decision was made to sever the rail line, an analysis was conducted to determine the preferred alignment for relocation of the freight rail service. The location preferred by the government agencies and the private freight rail companies was the active Minneapolis, Northfield and Southern (MN&S) line through St Louis Park. Shortly before the TH55/Hiawatha Avenue project was let and the freight rail was to be severed, it was determined that the National Lead/Golden Auto site in St Louis Park where the rail connection would be made was contaminated (and listed as a federal superfund site). MnDOT had approximately two to three months to find an alternate route for the freight rail relocation or the state was at risk of losing the TH55/Hiawatha Avenue federal funds.  The Cedar Lake/Kenilworth Corridor was chosen by MnDOT as the “temporary” (4 to 6 years) reroute for freight rail until such time that the National Lead/Golden Auto site was delisted or another alternative was found. To facilitate the TH 55/Hiawatha Avenue roadway project, the HCRRA agreed to the temporary rerouting of freight rail through the Kenilworth Corridor and entered into a three party agreement with the Canadian Pacific (formerly Soo Line) and Twin Cities and Western (TCW) Railroads.

MnDOT had two to three months to find an alternate route!  That’s gotta be a record.

Anyway, in keeping with Hennepin County’s policy of web profusion, there is also a separate site set up by the county for this whole issue, www.mnsrailstudy.org.  That page has more cool stuff, including some maps, but not the maps that were included in a presentation made to the Southwest Transitway Community Advisory Committe, and that I’ll reproduce here.

Alternatives from 2009 study

This map shows the alternatives for relocation that were explored in a 2009 study – the alternatives were estimated to cost between $60 and 136 million, compared to the $48m cost of the MN&S routing.

A lot to consider

This map shows the various factors in considering an alignment – the CP yards in Camden, congestion in the Target Field area, something called the Iron Triangle.  I think this map (and this process) shows what a questionable idea it was in the first place to sever the rail line.  Much as I enjoy the Midtown Greenway, we are left with a significant population center in South Minneapolis that is very poorly served by rail lines.  This is to some degree a historical situation – I’ve always been amazed at the huge swath of South/Southwest from Cedar to France to Minnehaha Creek to Lake Street that was basically homogeneously suburban residential – but has been made worse by the various severings of Hiawatha and the retrenchment of the Pleasant Ave track segment (not sure of the name).    My point (if I have one) is that after the Era of Cheap Energy is over, it might help to be able to take advantage of very high efficiency transportation modes.   Maybe the area is small enough that it could be effectively served by smaller trucks or freight light rail, but maybe it instead would have been prudent to not scrap the rail infrastructure.

Anyway, St Louis Park has its own side of the story of course, and it sounds like the alignment question may be answered in part by a judge.  If SLP’s appeal is successful, it could cause a significant delay in the Southwest Transitway project, currently hoping for revenue service in 2017 or 18.  So a highway project in Minneapolis caused a rail project in St Louis Park, which may prevent a transit project in Eden Prairie.  How much of this mess could have been prevented by consolidating agencies and municipalities?

8/9/11 Transportation & Public Works Committee

A couple interesting items from this week’s TPW committee:

  1. 22nd St E (re)construction.

This is not a typical reconstruction as the street was never “built” – it is still an “oiled dirt” street (a bit of a misnomer; I believe these are original dirt streets that used to be covered with oil in the old style but now are patched with asphalt).  Also, in a fun twist on the typical street “reconstruction,” 22nd will follow a new alignment that will reconnect it to Cedar Ave, only 61 years after it was severed in the ill-advised freewayfication of the Cedar-Franklin-Hiawatha intersection.  Here is the layout:

A connection is made

The plan is a vast improvement over the existing street – the narrowed intersection with Snelling banishes the menace of speeding trucks that make the city’s industrial districts so unpleasant.  Right now 22nd St is connected to Cedar Ave with a crumbly staircase; presumably the roadway and sidewalk connections will be a much better option for the many potential users on wheels.

The Project Map included in the committee report omitted two things:  First, a left turn lane on Cedar, which Seward Neighborhood Group and Redesign want here in order to close Minnehaha Ave between Franklin and Cedar.  The city believes that there will be too much traffic in the future to close that road, however, and as far as I know they are planning to reconstruct the intersection with a very similar layout to what is there today.

Ghost ramp

Second, the map is missing a connection from the new 22nd St to the Light Rail Trail.  The existing connection runs on public right-of-way that is being used as parking for some anonymous industry, and consists of a steep curb that is softened by a wood plank.  Sometimes the excitement of the connection is enhanced by repositioning the wood plank in lots of dangerous ways.  Apparently the long-term plan is for the main neighborhood connection to the trail to be at 24th St, but it seems like now may be a good time to add a cheap asphalt ramp or something at 22nd St.

As you can see, the project map is not very detailed.  It’s possible those two omitted items are actually a part of this project.  I couldn’t find any more details on the project page, though, so we’ll have to wait and see.

2.  Lowry Bridge Bike Lanes

There’s a ton of confusion about whether or not there will be bike facilities included on the new Lowry Bridge, despite their inclusion on the Minneapolis Bike Master Plan of 2001.  Apparently 10 years wasn’t enough time for Hennepin County to find time to look at that plan, so they designed the Lowry Bridge without bike facilities (or narrowed the bridge to save money and thereby chucked the bike lanes?  Thanks guys).  Now they say they can find room for lanes or a separated trail somewhere, but the layout dated 8/30/10 included in the TPW committee agenda doesn’t show them.  Maybe the county just hasn’t gotten the new layout to the city, or maybe they didn’t find room yet, or maybe they just told bicycle advocates they’d try to find room and then went upstairs and had a smoke and somebody spoke and they went into a dream.  We’ll know in “Summer 2012″ at the latest.

A Bridge Too Many

Once again this week’s TPW committee was packed with items that fascinate me and bore my girlfriend.  I’m going to comment on a couple:

Cedar Ave S Bridge

Blobs to be?

If you want a sample of the byzantine nature of transportation funding in the state of Minnesota, check out the RCA for this project.  Hennepin County is going to widen sidewalks on the bridge that carries Cedar Ave over CR-122 (referred to as Washington Ave SE in the committee agenda; someday I’ll post my rant on Minneapolis’ street naming “system” if I can cut it down to a length that doesn’t crash WordPress), also they’re replacing some streetlights and adding some nice railings.  If I’m reading it right, the only reason the issue is coming before the council is that Hennepin County awarded the city a TOD grant for this project, even though the county will be doing the work (“The project scope has limited implications to the City” according to the RCA).  The county seems to have awarded itself a grant.  Interesting the contortions that need to be made in order to improve the pedestrian environment.

If the project looks familiar, that’s because it first came up as a sweetener for the highway expansion project that Hennepin County submitted to the TIGER program.  It’s heartening that the County took this sweetener seriously enough to pursue it even without “free” money.  The RCA doesn’t mention widening the bridge, but mentions the same sidewalk widths as the TIGER application, implying the plan hasn’t changed.  Also not mentioned is the bridgehead “flaring” depicted in the sketch above; my guess is it won’t be included – the document I took the sketch from lists the flaring as a $750k expense over and above the $1m for widened sidewalks; the RCA lists the project cost as $1m total.

Van White Boulevard

A new place to slither

Pretty much everyone who’s been on Lyndale north of the Bottleneck has wished for another way between Uptown and the Northside.  Our wish will be granted by the Fall of 2012, when a half-mile segment of Van White Boulevard is scheduled to be completed at the cost of $42m per mile.  (Drivers, of course, will still have to contend with the Bottleneck itself, but the more mobile modes will be able to walk or bike through the park and avoid the mess – hopefully long-term plans include some paths through the mansions and up Lowry Hill, but I won’t count on it).

In order to just get this damn road built, they’re probably going to phase the project:  where the long-term plan calls for two bridges over the railroad tracks, each carrying one direction of travel, instead at first only one bridge will be built carrying both directions of travel.  I can’t help but ask the question why, then, they are planning to build two bridges at all.  The Bassett Creek Valley Plan answers that question – the city is planning for a lot of redevelopment in this area (although Hennepin County may throw a monkey wrench in the works).

The plan includes a bike path on the east side in place of the sidewalk.  North of Glenwood, it is a multi-use trail, with 6′ for pedestrians in addition to 10′ of bidirectional bike path; south of Glenwood the ped space disappears.  While I’m not much of a separatist in terms of non-motorized traffic, it seems like they could have designed it to include walking space along the entire segment.  It even looks like they bought enough right-of-way for it; isn’t it just the same old story that a bridge would be designed for twice the projected amount of cars but half the projected amount of pedestrians?

 

Comments galore

I’d be proud – and humbled – if I was able to make a 138-page document out of the comments on one of my blog posts.  But that’s what Don Pflaum did with the comments on his Bicycle Master Plan – the document, which collects email comments and summarizes comments made at public meetings, was posted on the agenda of the 11/30/10 Public Works & Transportation Committee meeting (I don’t think the document is on the Bike Master Plan webpage yet).

You could not pay me to read the whole document.  But I have to admit that I skimmed it and read some of it – mostly because I saw my name, “Alex B,” on the first page, which lists then names of all commenters.  It was a bit surprising to see myself there, because I didn’t remember commenting.  When I’d skimmed to my comment, I was even more surprised:

Hopefully the Cedar Lake Trail reconstruction will find a way to widen the approx. 700 feet east of
the Wirth Pkwy bridge. At about 11 feet for bidirectional bike travel and pedestrians, it’s waaay too
narrow.

Pretty sure I left that as a comment on a blog entry (In Transit maybe?  I can’t find it now).  Maybe I was drunk and submitted it as a comment to the public record, too.  Certainly I’ve said stupider things when I was drunk.

According to my memory, I chose not to comment on the Bike Master Plan because it reminded me of the multitude of plans that Minneapolis has adopted and quickly forgotten.  The only part of the plan that is at all important is the map of designated routes, and that is only important because Public Works policy is to not put bike facilities on any street that isn’t designated in the plan – which is a really stupid policy, not to mention unfair (why isn’t there a map of private auto facilities, and if a street isn’t on that map, then it doesn’t get free parking).  So my comment would have been to designate every street as deserving of some cycle facilities, and also that cycle capital funds should come from property taxes, and I just thought that would be too radical – especially for a farmboy like Pflaum.

Also of note – Hennepin County’s comments to the plan.  I’d quote them here, but for some reason they are saved as a picture rather than text, and that would be too much work.  Anyway, it is always interesting when one level of government comments on another level of government because it makes obvious the ridiculous layering that exists in fragmented regions like ours.  This is actually a great example, because Hennepin County already has a Bicycle Master Plan, and most of the comments deal with the differences between the two plans.  Some highlights:

  • “The County has 156 of its 900 mile bikeway system designated in Minneapolis.”  My understanding is that these are designated miles, rather than existing miles.  Whether they will ever be built is an open question, of course.
  • Washington Ave S from 11th Ave S to 3rd St S – the County has a good point here about how cycle facilities largely duplicate parallel facilities.  Also the County goads the City about “completing the connections necessary to the trail tunnel that was built under the new I-35W bridge south approach to finish this facility.”  Finally, there is a brief mention of the 4th St ramp plan that recently failed to win a TIGER grant.
  • 26th Ave S from Minnehaha to Franklin – It was gratifying to see County support for full lanes here (instead of the sharrows on the plan), as I have advocated for them in this chain of emails:

— On Fri, 8/13/10, Alex Bauman  wrote:

From: Alex Bauman
Subject: Re: 26th Ave S Resurfacing
To: James.Grube@co.hennepin.mn.us
Cc: Cam.Gordon@ci.minneapolis.mn.us, commissioner.mclaughlin@co.hennepin.mn.us, donald.pflaum@ci.minneapolis.mn.us, katya@redesigninc.org
Date: Friday, August 13, 2010, 10:45 AM

Thanks, Mr. Grube, for again taking the time to explain and clarify.

Seward Redesign is working on a plan for bike lanes on Franklin Ave E, which I believe would satisfy your requirement for logical termini.  Katya Pilling has agreed to speak with you about that, if you like.  Her contact info is as follows:

Katya Pilling

Associate Director

Redesign, Inc.

2619 E. Franklin Avenue

Minneapolis, MN   55406

612.338.8729

katya@redesigninc.org

Thanks again.

-Alex

— On Thu, 8/5/10, James.Grube@co.hennepin.mn.us <James.Grube@co.hennepin.mn.us> wrote:

From: James.Grube@co.hennepin.mn.us <James.Grube@co.hennepin.mn.us>
Subject: Re: 26th Ave S Resurfacing
To: “Alex Bauman”
Cc: Cam.Gordon@ci.minneapolis.mn.us, commissioner.mclaughlin@co.hennepin.mn.us, donald.pflaum@ci.minneapolis.mn.us
Date: Thursday, August 5, 2010, 2:11 PM

Mr. Bauman,
In answer to your questions:
1.  It is possible to re-stripe 26th Avenue S without resurfacing.  We’ve done it before on other streets.
2.  Logical termini are connections to other trails, parks, or something of that order.  For instance when the city is completed with its trail on
Minnehaha, 26th will have logical termini at the Greenway and the Minnehaha trail.  In the past we’ve striped on road shoulders for bike use then
transitioned to bike lanes when we had the termini.  I dislike taking bikers along a formal bike lane only to have it evaporate on them.
Jim Grube

From:    Alex Bauman
To:    James.Grube@co.hennepin.mn.us
Cc:    Cam.Gordon@ci.minneapolis.mn.us, commissioner.mclaughlin@co.hennepin.mn.us, donald.pflaum@ci.minneapolis.mn.us
Date:    08/05/2010 12:18 PM
Subject:    Re: 26th Ave S Resurfacing

Thanks, Mr. Grube, for your fast and thorough response.  I wonder if you (or
the others copied) can help me by clarifying two things:

1.  Is it possible to re-stripe 26th Ave S without resurfacing?
2.  What is an example of what a logical terminus would look like?

Thanks again for your time and thoughts.

Alex

— On Wed, 8/4/10, James.Grube@co.hennepin.mn.us
<James.Grube@co.hennepin.mn.us> wrote:

From: James.Grube@co.hennepin.mn.us <James.Grube@co.hennepin.mn.us>
Subject: Re: 26th Ave S Resurfacing
To: “Alex Bauman”

Cc: Cam.Gordon@ci.minneapolis.mn.us,
commissioner.mclaughlin@co.hennepin.mn.us, donald.pflaum@ci.minneapolis.mn.us
Date: Wednesday, August 4, 2010, 3:25 PM

Mr. Bauman,
As the County Engineer, I am responsible for the overlay and striping that
occurred along 26th.  You are correct about 26th being on the city’s bike
plan, and the county’s Complete Streets policy seeking greater modal options
for the citizens.  In this case we did provide the makings of a
connection along 26th between the Greenway and the city’s bike lanes along
Minnehaha and we thought that was okay for now.  To be honest we didn’t
really have much conversation about 26th to the north.  When I looked at it I
noticed parking in the business areas and thought it would be a bit too
hard to get lanes introduced with logical termini this year, and felt the
overlay was needed now.  So in essence we elected to make sure the paving
got done because of need.  In fact, we’ve had similar conversations for other
road segments in the city.  Much as we’d like to be able to get the bike
lanes at the same time as the overlay, we recognize we stripe the roads each
year.  That means we can address the lanes with the city in a coordinated
manner when it makes sense across the city.  I’ll certainly bring the issue up
with city staff and we can discuss how this fits with an overall city
action plan.
Jim Grube

From:    Alex Bauman
To:    Cam.Gordon@ci.minneapolis.mn.us,
commissioner.mclaughlin@co.hennepin.mn.us, donald.pflaum@ci.minneapolis.mn.us,
james.grube@co.hennepin.mn.us
Date:    08/04/2010 10:13 AM
Subject:    26th Ave S Resurfacing

Hi,

Can someone explain why 26th Ave S was striped without bike lanes north of the
Midtown Greenway after the recent
resurfacing?

The Minneapolis Bikeways Master Plan of 2001 identifies the whole length of
26th Ave S as a candidate for an on-street
bike lane.  There is certainly room on 26th Ave S, as streets with comparable
widths and traffic volumes currently
include bike lanes (along with, of course, 2 lanes for through automobile
traffic and 2 lanes for automobile parking),
for example 4th Ave N and 2nd St N and S.

In addition, Hennepin County Complete Streets Policy requires facilities for
all road users to be included on all
projects.  I understand that doesn’t necessarily mean bike lanes, but they are
the preferred on-street facility for
cyclists, and could have been accommodated in the case of 26th Ave S.  Can you
explain why they were not striped north
of the Midtown Greenway?

Thanks,

Alex Bauman

  • Sharrows – the County apparently understands that sharrows are bogus, the “only support the use of these types of markings in very limited circumstances.”  But an alternative that is acceptable to the County is “postponing any action until an opportunity occurs” – commonly known as doing nothing.
  • Monolithic gutter pans – this one is worth quoting in full:  “Some additional background may be desirable in relation to the monolithic gutter pan mentioned on page 5-29.  This approach was first proposed in 1994 for University Avenue and 4th Street SE in the vicinity of the University of Minnesota as an outgrowth of a task force involving the city, county, neighborhoods, U of M, and local businesses.”  Everyone loves monolithic gutter pans, right?

You know, the County says some other interesting stuff, but the fact that their comments appear as images in the pdf makes it slow to read, so I’m going to stop now.  Have you had enough anyway?